Description
A waterproofing construction package based on controlling the moisture balance of the substrate. On-site, a moisture meter is used to create a full-roof humidity map to determine the workable areas. Then, different moisture-permeable coatings are applied to each area according to its dryness level.
In high-humidity areas, a moisture-wicking primer is applied first; in low-humidity areas, a standard waterproof layer is applied directly. After all coatings are applied, a uniform topcoat is applied over the entire area.
Delivery includes a humidity trend chart. This package does not have a fixed drying time; the start time and coating selection for each area are sorted individually based on initial humidity data.





